A Subtask lets you break a larger piece of work down into smaller, more manageable units without losing its connection to the parent. It's placed within the parent Task's timeframe and linked to it through Start-to-Start and Finish-to-Finish dependencies, so it's automatically bound by the parent's duration. If the Subtask ever extends beyond that window, a conflict warning surfaces rather than letting it silently drift. This makes Subtasks useful for detailed, day-to-day planning that sits underneath a broader Task, while keeping that detail tied back to the higher-level scope it belongs to. A Task can also be split into several Subtasks at once when the work needs to be divided into a full sequence rather than just one piece.
- Click on a Task
- Click on the three-dot icon to open the menu
- Click on Create subtasks
- Decide how to sequence the subtasks
- Create a single subtask for the full duration
- Create tasks no longer than [x] days
- Clicking on this option will open a field in which to type in a duration
- Create at the start of each
- Clicking on this option will open a dropdown in which to select the starting point of each subtask split (best used for multi-week duration Tasks)
- Clicking on this option will open a dropdown in which to select the starting point of each subtask split (best used for multi-week duration Tasks)
- Click the Create button which will show you how many Subtasks will be created
You can also create Subtasks on one-day Tasks, which also allows you to create Predecessor and Successor Tasks.
- Hover over the Task to which you wish to add a predecessor, subtask, or successor
- Click on the dot that appears above the cursor
- Click on either the Predecessor, Subtask, or Successor icons to insert it in its corresponding spot relative to the Task