Overview
A Plan is the primary structured layout in Hoylu for scheduling and tracking work — a timeline element placed on a Workspace that organizes Task Cards into one or more Swimlanes. It's connected directly to the Project's Task database, so it stays live, and a Workspace can hold more than one Plan at a time, each covering a different time range, Team, Category of Labels, or level of detail while drawing from the same underlying data.

If you want to create an entirely new Plan from scratch, follow these steps:
-
Click on the plus button on the Toolbar
-
Click on "Add Plan…"
-
Click and drag a Plan from the options into an empty area of the Workspace
- Plan - creates a single Swimlane plan (best used as a staging area, will not appear in reporting)
- Plan by Team - creates a Swimlane for each Team
-
Plan by Category - creates a Swimlane for each Label associated to existing Categories (check out this article to see how to set this up beforehand)
- Adjust its placement in the Workspace by grabbing the top edge and clicking and dragging it to your desired location
Because this only creates the Plan structure, if you have Tasks, Milestones, or Constraints assigned to the corresponding Category and Labels, they can be imported directly into the Plan.
See this article to learn how to do this using the Import button that appears to the right of the Plan title: Import Tasks into a Plan
Plan Settings

-
Click on the three-dot icon to open the Plan Menu
-
Click on Settings
-
Type in a new Plan name
-
Set the start and end date of your Plan
-
Set your Clean up strategy to your preferred duration
- Add, edit, or reorder the Swimlanes in the Plan
Plan Options

Clicking on the three-dot icon also shows you several options to organize the Swimlanes of your Plan.
- Clean up & resize all - this will adjust any overlapping elements and set them all in a waterfall based off what you program in the Clean Up Strategy in the Settings menu
- Collapse all swimlanes - Reduces the size of all Swimlanes so they appear as a thin bar, hiding your data until you wish to see them again; this does not hide your data from any reports
- Collapse all empty swimlanes - Reduces the size of all empty Swimlanes so you can hide them until you need to add elements to them
- Expand all swimlanes - Expands all Swimlanes to the lengths they were before they were collapsed
Three additional options appear in this menu:
- Copy Link to element - allows you to copy a Deep Link of the Plan so anyone who accesses the link will be sent directly to the Plan's location in the Workspace
- Copy internal link - best suited when duplicating a Workspace for templating purposes
- Delete plan - Deletes the Plan from the Workspace, but does not delete the Task information
To import a Plan from Project Tasks, click on this article: Import a Plan
To learn how to navigate your new Plan, click on this article: Navigate the Plan
To manage your Swimlanes, click on this article: Manage Swimlanes
To learn more about Deep Links, click on this article: Deep Links
Comments
0 comments
Article is closed for comments.